4. ESTIMATING ROAD CONSTRUCTION UNIT COSTS
The costs for each of these operations can be developed by estimating the equipment production rates and machine rates. EXAMPLE: A relatively complex surfacing operation requires developing a 20,000 cubic meter solid rock source (26,400 cubic meters in the road prism) to surface km of road including shooting and crushing rock, loading, transporting, and spreading rock as .